Guangdong, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
695
Year of Establishment:
2009-04-29
Management System Certification:
ISO9001:2015, ISO14001:2015, OHSAS18001:2007
Average Lead Time:
Peak season lead time: 1-3 months
Off season lead time: 1-3 months
OEM/ODM Service
Sample Available
Overseas Agent / Branch
Russian / Spanish / French / Portuguese Speaker

Transformer, Power Transformer, Oil Immersed Transformer manufacturer / supplier in China, offering 63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction, 11-220 Kv Power Transformer and Distribution Transformer with Oil Type and Dry Type, Integrative Solar Step-up Substation with Inverter and so on.

Diamond Member Since 2010
Audited Supplier
Supplier Homepage Products Power Transformer 63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction
  • 63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction
  • 63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction
  • 63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction
  • 63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction
  • 63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction
  • 63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction

63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction

Min. Order / Reference FOB Price
1 Piece US $105,000-154,000/ Piece
Port: Guangzhou, China
Production Capacity: 1
Payment Terms: L/C, T/T
Application: Power, Power Transmission
Phase: Three
Core: Core-type Transformer
Cooling Method: Oil-immersed Type Transformer
Winding Type: Two-winding Transformer
Certification: ISO9001-2000, ISO9001, CCC

You Might Also Like

Loading...

Basic Info.

Model NO.
PEO-S-63, 000/220/33
Usage
Power Transformer, Oil Immersed Tranformer
Frequency Characteristics
High Frequency
Shape of Core
U
Brand
Pearl
Type
Power Transformer
Reference Standards
IEC 60076
Rated Capacity
63 Mva
Voltage (Hv) (Kv)
220kv
Voltage (LV) (Kv)
33kv
Cooling Way
Onan/Onaf
Impedance
as Per IEC Standard
Core Material
Silicon Steel
Winding Material
Copper/Aluminum
Temperature Rise (W)
60/65K
Vector Group
Dyn11
Insulation Class
a-Class
Insulation Media
Mineral Oil as Per IEC 60296
AC Withstand Voltage
as Per IEC Standard
Lightning Impulse Withstand Voltage
as Per IEC Standard
Trademark
PEARL ElECTRIC(PE)
Transport Package
Wooden Pallet, Wooden Case
Specification
As per manufacturer′s standard design
Origin
China
HS Code
8504220000
63 mVA 220/33 kV 3-phase power transformer

63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction



Product Features
1. Long life cycle
2. Hign insulation level
3. Oil leak proof design
4. Excellent control for cooling
5. Reasonabkle accessories selection
6. Strong short circuit  withstand ability
7. Low loss, Low noise, Free maintenance 



Advanced Design

1. Adopting the art standard three dimesion design software to produce correct and complete engineering documentation.
2.  Adopting the craft of  high frequency -welding and winding-Hydraulic compaction to  improve short  circuit ability. 
3. Adopting the craft of core Hydraulic compaction to improve the strength of core for reducing the noise level.
4.  Designing the transformer base on  the worst short circuit conditions for avoiding short circuit issue.
5. Adopting Electric Stress field calculation program to guarentee insulation level.
6. Adopting high quality rubber gaskets in groove for leak.





Quality Assurance
1. Adopting the Quality Control Verification Card to control quality in the whole manufacturing operations.
2. Strictly selecting the transformer raw material and the suppliers of accessories in domestic and abroad.
3. All transformers get authentication of ISO9001, ISO14001, OHSAS18001 AND CE.
4. Comprehensive Training for workes and staffs to improve service quality.


63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction

Project Reference
1.  88kV power transformer for AC traction subsation in South Africa.
2.  230kV power transformer for Gas power station in Myanmar.
3.  110kV power transformer for hydropower project in Vietnam.
4.  .....
63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction





Transformer Catalogue
Transformer DescriptionSpecifications
110 kV  two windings power transformer with de-energized tap-changer
Parameter base on IEC standard, more details  Kindly contact with us
110 kV  two windings power transformer with on-load tap-changer
110 kV  three windings power transformer with on-load tap-changer
220 kV  two windings power transformer with on-load tap-changer
220 kV  three windings power transformer with on-load tap-changer



 
Pearl Electric Co., Ltd
 
Established in 1958, located in Guangzhou City,  Pearl Electric Co., Ltd is one of  the most prominent power transformer manufacturer in China which design, produce and supply power transformers in domestic and abroad with almost 660 employees, more than 260 sets of specialized manufacturing equipment and 90,000 square meters area .

63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction


63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction

63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction

63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction

PEARL ELETRIC DESIGNS, MANUFACTURES AND SUPPLIES: 
Staple ItemsAnnual Production Capability 
Oil-immersed transformer    2.5 million kVA
Dry-type transformer      2 million Kva
Amorphous dry-type transformer   1 million
Amorphous oil-immersed transformer 2.28 million kVA
Pad-mounted transformer for wind power plant 500 sets
Pre-fabricated substation for wind power plant  500 sets
10kV pad-mounted transformer/pre-fabricated substation500 sets
Arc suppression reactor earthing assembly    360 sets
Reactor        1.20 million kVA

63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction


PEARL'S RESEARCH & DESIGN TEAM 

63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction

INDUSTRIAL USERS IN DOMESTIC AND ABROAD 

63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction

FAQ:
 1.Q: Are you manufacturer?
    A: Yes, we are manufacturer. Our factory is in Guangzhou City, Guangdong Province.
2.Q: Can I get guarantee of products?
    A:  Yes, every product is 1 year quality warrantee under customer correct using the products.
3.Q: Do you have any Certificate?
    A: Yes. Each of our unit has CE, 3C and KEMA certificate. If you need any other Certificate, we can help you to apply it.
4.Q: How can I pay you?
    A: Pay by T/T and  L/C is acceptable.
5.Q: What about the production?
    A: In general,  it take 4~6weeks and it depend on the different style.


Any need for power transformer, please feel free to contact us:
Sandy | Oversea sales | Oversea Dept.
Pearl Electric Co., Ltd. 
Add: No. 118 Donghuan Road, Donghuan Street, Panyu Distric, Guangzhou City, Guangdong Province, China.  ZIP: 511400
Web:pearl-electric.en.made-in-china.com


 

Send your message to this supplier

*From:
*To:
avatar Miss Sandy Zhou
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Loading...

Contact Supplier

Miss Sandy Zhou
Oversea Business Manager
63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction pictures & photos
63 Mva 220/33 Kv 3-Phase Power Transformer for Substation Construction
US $105,000-154,000 / Piece
Min. Order: 1 Piece