2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant

Product Details
Customization: Available
Application: Step Up Substation used in Photovoltaic Plant
Phase: Three Phase
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (32)
  • 2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant
  • 2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant
  • 2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant
  • 2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant
  • 2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant
  • 2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Certifications
  • Company Profile
Overview

Basic Info.

Model NO.
YBP-2500/40.5/0.8
Core
Silicon Steel Core or Amorphous Alloy Core
Cooling Method
Liquid type or Dry-type
Winding Type
Two-winding Transformer
Certification
ISO9001, CCC, ISO14001
Usage
Photovoltaic Plant
Frequency Characteristics
50Hz or 60Hz
Shape of Core
Customization
Brand
Pearl Electric
Capacity
2500 kVA
Rated H. V.
40.5kV
Rated L. V.
0.8kV
Impedance
4.5%
Insulation Level
IEC Standard
Reference Standards
IEC60076
Frequency
50 Hz / 60 Hz
Tapping Range
+2X2.5%/-2X2.5%
Vector Group
Dy11 or customization
Winding Material
Copper
Lightning Impulse Withstand Voltage
as Per IEC Standard
Specification
Copper/Aluminum Winding
Trademark
PEARL ELECTRIC
Origin
Guangzhou, China
HS Code
8504220000

Packaging & Delivery

Package Size
1.00cm * 1.00cm * 1.00cm
Package Gross Weight
1.000kg

Product Description

 
New Energy Step Up Substation used in Photovoltaic Power Plant
Product Description
Description about Step Up Substation used in Photovoltaic Power Plant
A solar inverter transformer substation is a specialized electrical substation that integrates solar inverters and transformers to facilitate the conversion of solar-generated electricity for grid connection or local distribution. This substation plays a crucial role in large solar power installations, such as utility-scale solar farms, by ensuring the efficient and safe transformation of electrical power from DC to AC and then stepping it up to higher voltages for transmission.
Pearl Electric, an experienced solar substation manufacturer since 1958, offers Solar Inverter Transformer Substation for AC and DC voltages, 50 and 60 Hz and IEC or IEEE standard, Pearl Electric's technology and innovation can help increase reliability of solar energy, while lowering environmental impact and reducing life cycle costs.
2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant
Product Parameters
Technical Specifications  Datasheet for Step Up Substation used in Photovoltaic Power Plant
Compartment Item Parameters
Transformer Rated Capacity 2500KVA
Rated Primary Voltage 40.5KV
Rated Secondary Voltage 0.8KV
Cooling Method Liquid type or Dry-type
High Voltage Compartment(RMU) According to project requirements
LV compartment According to project requirements
Protective Enclosure Support customization, Up to IP 54
Certifications

Certifications and Test Reports

1. ISO 9001:2015 Quality Management System Certificate
2. ISO 14001:2015 Environmental Management System Certificate
3. ISO 45001: 2018 Occupational Health and Safety Management System Certificate
4. CE Certifications for dry type transformer and oil-immersed power transformer
5. KEMA Test Report for Cast Resin Dry Type Transformer and Oil-filled Distribution transformer
6. DEKRA TYTE TEST CERTIFICATES for Prefabricated Substation
2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant
Company Profile
 
 Pearl Electric, located in Guangzhou, China, was founded in 1958 and is an outstanding power equipment supplier in the transmission and distribution industry. With a land area of 100000 square meters, over 600 employees, and an annual turnover of over USD 142 million, we currently have over 200000 transformers in operation, which have been sold to Southeast Asia, Central Asia, Africa, Europe, North America and other regions.
Pearl Electric started to supply NEW ENERGY TRANSFORMER in 2017.  With around 10years market development, we build up business relationship with nice solar clients includes JINKO SOLAR, HUAWEI, SUNGROW, etc.,  as well as TOP 5 State-owned Group in China. Our solar energy product includes:
  1. Solar Energy Storage Integrated substation / we cooperated with several PCS leaders in China.
  2. Power transformer up to 132KV for solar application.
  3. Step-up and Step-down distribution transformer, both oil immersed type and cast resin dry type.   
2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant
 
Pearl Electric is devoted to providing safe, highly efficient and intelligent power transformation and distribution solution, focusing on R&D, manufacturing, sales and service as below:
 
2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant2.5MVA 40.5KV New Energy Step Up Substation used in Photovoltaic Power Plant
 
 
FAQ:
 1.Q: Are you manufacturer?
    A: Yes, we are manufacturer. Our factory is in Guangzhou City, Guangdong Province.
2.Q: Do you have any Certificate?
    A: Yes. Our transformer has awarded CE, UL, KEMA certificate. If you need any other Certificate, we can help you to apply it.
3.Q: How can I pay you?
    A: Pay by T/T and  L/C is acceptable.
4.Q: What about the production?
    A: In general,  it take 4~6weeks and it depend on the different style.
5. Q:How contact us to get quick inquiry ? Follow us in our company website.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier