Three Phase Energy Strorage Substation PCS-integrated Substation
Product Description
TECHNICAL SPECIFICATIONS:
- High voltage side voltage level: Up to 40.5Kv
- Low voltage side voltage level: 0.69kV or customized
- High voltage switch: Load switch fuse combination device or vacuum circuit breaker
- Auxiliary transformer: The box transformer can be equipped with an auxiliary transformer, which can also be connected by the power supply of the booster station
- PCS, battery system configuration based on transformer capacity
- Frequency: 50Hz or 60Hz
- Phases: Three-Phase
- Vector Group: Dyn11, Yyn0 or others
- Insulation Class: A class
- Temperature rise: 60/65K
- Winding material: Copper or Aluminum
- Standards: IEC60076 or Local standard
GENERAL INTRODUCTION OF ENERGY STORAGE SUBSTATION
Energy storage power stations are established to regulate peak and valley electricity consumption.
Energy storage stations can store electricity and release it when needed, effectively solving the imbalance of electricity in time and space. Realize peak shaving and valley filling in the power system, smooth and track fluctuations in renewable energy generation, efficiently regulate system frequency, and increase power supply reliability.
The energy storage power stations corresponding to wind and photovoltaic power generation belong to battery energy storage power stations, which mainly include energy storage converter systems, BMS systems, EMS systems, and other components.
The Energy Storage Box Transformer produced by Pearl Electric is converter equipment and the core equipment of the energy storage system, which must operate reliably and stably. The energy storage boost converter integrated machine is currently the mainstream model, integrating transformers, energy storage converters, and their control systems.
The configuration of the energy storage box transformer is similar to that of the photovoltaic inverter boost integrated machine, with the main difference being that the inverter of the energy storage integrated machine is a bidirectional PCS device. Another difference is based on the requirements of fire safety regulations, where dry-type transformers are generally used.
MAIN FEATURES OF ENERGY STORAGE SUBSTATION
- Highly integrated with small footprint;
- Short production cycle and low unit electricity cost;
- Container design for convenient transportation;
- A comprehensive temperature control system, using high-grade flame-retardant materials, safe and reliable;
- Strong environmental adaptability and simple operation and maintenance management
COMPARTMENTS OF ENERGY STORAGE SUBSTATION
- Transformer
- Vacuum circuit breaker
- Current transformer
- Lightning arrester
- Surge protector
- Control Transformer
- UPS power supply
- Molded case circuit breaker
- Miniature circuit breaker
- Temperature and humidity controller
- Box transformer monitoring unit
- Box transformer housing
- PCS equipment
- AC main circuit breaker
Company Profile
PEARL ELECTRIC CO., LTD.
Pearl Electric established in 1958, located in Guangzhou, China which is an experienced transformer factory to design, produce and supply distribution transformer and power transformer and up to 150MVA 220KV.
Pearl Electric is devoted to providing safe, highly efficient and intelligent power transformation and distribution solution, focusing on R&D, manufacturing, sales and service as below:
★ Cast Resin Dry Type Transformer Up to 30MVA, 40.5kV
★ Oil-immersed Power Transformer Up to 150MVA, 220kV
★ Pad-mounted Transformer Up to 10MVA, 40.5Kv
★ Compact Substation Transformer Up to 10MVA, 40.5kV
Reactors and other power transformation/transmission equipment.
PEARL ELETRIC DESIGNS, MANUFACTURES AND SUPPLIES:
Staple Items |
Annual Production Capability |
Oil-immersed transformer |
2.5 million kVA |
Dry-type transformer |
2 million Kva |
Amorphous dry-type transformer |
1 million |
Amorphous oil-immersed transformer |
2.28 million kVA |
Pad-mounted transformer for wind power plant |
500 sets |
Pre-fabricated substation for wind power plant |
500 sets |
10kV pad-mounted transformer/pre-fabricated substation |
500 sets |
Arc suppression reactor earthing assembly |
360 sets |
Reactor |
1.20 million kVA |
PEARL'S RESEARCH & DESIGN TEAM
INDUSTRIAL USERS IN DOMESTIC AND ABROAD
![Three Phase Energy Strorage Substation PCS-integrated Substation](//www.micstatic.com/athena/img/transparent.png)
FAQ:
1.Q: Are you manufacturer?
A: Yes, we are manufacturer. Our factory is in Guangzhou City, Guangdong Province.
2.Q: Can I get guarantee of products?
A: Yes, every product is 1 year quality warrantee under customer correct using the products.
3.Q: Do you have any Certificate?
A: Yes. Each of our unit has CE, 3C and KEMA certificate. If you need any other Certificate, we can help you to apply it.
4.Q: How can I pay you?
A: Pay by T/T and L/C is acceptable.
5.Q: What about the production?
A: In general, it take 4~6weeks and it depend on the different style.
Any need for power transformer, please feel free to contact us:
Sandy
| Oversea sales
| Oversea Dept.
Pearl Electric Co., Ltd.
Add: No. No. 220, Tanxin Road, Dagang Town, Nansha District,GuangZhou.
Web:pearl-electric.en.made-in-china.com